Kirkland Concrete Company

Slab foundation building in Kirkland WA - a level floor that drains and holds up

Planning a garage, shop or addition and need a floor to build on? We'll pour a slab that sits level and drains away from it.

Request an estimate
Decorative stamped concrete driveway with a gray wood-grain pattern extends across the front of a blue-and-white house.

What goes into a slab foundation in Kirkland?

Slab foundation building in Kirkland, WA means pouring a reinforced concrete slab right on dug-out, packed ground so it becomes the floor and the foundation for a garage, shop, addition or small building. Steel sized and placed inside it holds it together, and the concrete is protected while it sets so it can carry what you build on top.

Most people who call me about a slab already have plans in hand, often for a detached garage, a shop or an addition, and want to know what their ground and the city will mean for the job. The price moves with the slab's size and thickness, how much digging and base the site needs, how much steel goes in and how close a concrete truck can get, plus any extra steps the city asks for on your lot. The schedule mostly turns on what the city says about your lot and the weather in the weeks you want to pour, and if your plans need concrete footings under the walls, those go in first. You'll get the figure for your own job at the estimate, once I've walked the site.

How we do slab foundation building

I start by walking the lot and checking what the city's maps show for it, because that can change the plan and the schedule before we dig anything. Then our crew digs out the topsoil and soft ground down to the subgrade, the firm ground the slab will sit on, and brings in gravel that we pack down in layers so the slab doesn't settle with the dirt under it. We set the forms, make sure the finished grade sends water away from the building, and set the rebar, the steel that ties the slab together, up on supports at the height it's drawn for so it ends up inside the concrete instead of pressed into the dirt. We pour early in the day to stay out of the afternoon heat, which can leave a weak, dusty top. Then we finish the surface and cut control joints, shallow grooves that give the concrete a place to crack where we choose. After that we keep the slab covered and protected while it cures and gains strength. The base is the part nobody sees once the concrete is down and the first thing people want to trim from a budget, and I won't trim it, because a slab is only as flat as what's under it.

A slab is often one piece of a bigger build. When the plans call for footings and walls with a crawl space under the floor, that's foundation installation, and we can handle both parts on the same project. For small property owners putting up a shop or a rental, we can also take on concrete parking lot building for the ground around it, so the base work and the drainage get planned together.

  • Slab with thickened edges

    The edges are dug deeper and poured in one piece with the floor, which suits garages, sheds and smaller shops on fairly level ground. It's usually the simplest way to put a building on a slab, and it often costs the least.

  • Slab over separate footings

    We pour footings or short walls first and the slab inside them after, which suits larger buildings, additions tied to a house and lots that slope. It's an extra step, but the walls get their own support and the slab can sit level where the ground doesn't.

Slab foundation building on Kirkland lots

In Kirkland, work within a geologically hazardous area needs a critical area permit from the city, and those areas include land prone to landslides or severe erosion. The city's interactive maps give you a general idea of where critical areas are, but only the city can say what applies to your property, and it asks owners to contact it early to confirm whether that permit is needed. Its guidance also says a lot within 125 feet of a stream or 300 feet of a wetland should be looked at by a qualified professional. Fees and review times depend on the project's size and the type of critical area, so that early check is what sets a realistic budget and start date. When your job needs a permit, I'll tell you at the estimate and either take care of the application with the city or county or walk you through it, so you know where it stands. The city's Development Services Center takes permit questions at 425-587-3600.

A lot of the slabs we pour around here go on sloped or tight lots where the truck can't pull right up, and our wet months put rain into every plan, so we work out the pour route and where the water will run before the forms go up. We're based in Kirkland and work across the cities around it, inside city limits and out in the county areas, and we plan slabs the same way on jobs in Bellevue and Redmond.

Get a slab foundation estimate for your lot

Send your lot address, the slab size you're planning and anything the city's maps show for the lot, and we'll reply within one business day to set a time for me to come out. I'll look at the site and give you a free estimate, with no pressure to book.

(425) 285-8643

Slab foundation questions from Kirkland

How much does a slab foundation cost in Kirkland, WA?

An installed slab foundation in the Seattle area usually costs about $9 to $17 per square foot. That's the area's usual range for a finished slab, not our price, and where yours lands depends on your site and your plans. I'll give you a figure for your own slab once I've walked the lot.

Will a new concrete slab foundation crack?

Probably some, yes, and anyone who promises otherwise isn't being straight with you. Concrete industry guidance says reinforcement won't stop a slab from cracking, but steel that's properly sized and placed keeps the cracks that do form tightly closed. Ask any contractor how they'll size and place the steel, and I'll walk you through ours before the pour.

What is the best way to pour a slab foundation in cold weather?

Plan for protection before the truck shows up. A concrete industry guide to cold weather pours says cold weather conditions exist when the air has fallen to 40°F, or is expected to fall below it, during the time fresh concrete needs protecting. If you're building in the cooler months, ask how the slab will be protected through that period, and we'll pick the pour day around the forecast and keep the slab covered through it.

How do I apply for a Kirkland permit for a slab foundation?

You apply online through MyBuildingPermit.com, as the city's permit page explains. The same portal handles inspection scheduling, permit status, construction tip sheets and inspection checklists, so you can follow the project there as it moves along. If your job needs a permit, we'll handle the application or walk you through it, as I said above.

When does Kirkland require a geotechnical report for a slab foundation?

The city may require a geotechnical report with any land surface modification permit application, and when it does, a qualified geotechnical engineer or engineering geologist prepares it. If your lot needs one, it adds a step before we can dig, so it's worth finding out at the start.

What is the difference between a slab foundation and a crawl space foundation?

A slab foundation sits right on packed ground with the concrete as your floor, while a crawl space foundation stands on footings and walls with open space under the floor. A slab is usually simpler and sits lower to the ground, and a crawl space leaves room under the building for plumbing and wiring later. Your plans and your lot usually decide it, and I'll tell you at the estimate which one fits.

Start planning your Kirkland slab foundation

Call (425) 285-8643 or use the form now, because the city check and the weather both shape when your slab can go in, and an early start leaves more good pour days to choose from.

(425) 285-8643
(425) 285-8643Request an estimate